End Use: Warehouse building for an online shop companyProject Started & Completed: May 2019- July 2019Total Weight: 900 tonsScope:• Purchasing Raw Material (with 3.1 certificate)• Structural Steel Fabrication according to EN 1090-EXC2.• QA/QC• Transportation to Site (DDP/Netherlands) Location: Netherlands Project had time constraints and our foremost aim was to meet the deadline. The box profiles (600 tons-S275JR-S355JR) were ordered from […]
End Use: Steel racksProject Started & Completed: September 2019 – November 2019Total Weight: 480 tonsScope:• Purchasing Raw Material (with 3.1 certificate)• Structural Steel Fabrication according to EN 1090-EXC2.• QA/QC• Coating (Hot-dip galvanizing)• Transportation to Site (DDP/Netherlands) Location: Netherlands YENA completed a Reefer Rack Project Fabrication on a very tight schedule including manufacturing and galvanizing. Manufacturing was done in accordance with […]
End Use: LNG Petro Storage SiteProject Started & Completed: August 2019 – September 2019Total Weight: 70 tonsScope:• Tekla Design• Execution of Shop Drawings• Purchasing Raw Material (with 3.1 certificate)• Structural Steel Fabrication according to EN 1090-EXC2.• QA/QC• Coating (Hot-dip galvanizing)• Transportation to Site (DDP/Netherlands) Location: Netherlands This Project was commissioned by a tank terminal building in Amsterdam. Project included pipe […]
End Use: BuildingProject Started & Completed: November 2019 – January 2020Total Weight: 200 tonsScope:• Purchasing Raw Material (with 3.1 certificate)• CNC ribbing application on plates• Structural Steel Fabrication according to EN 1090-EXC3. • QA/QC• Transportation to Site (DDP/Netherlands) Location: Netherlands The parts seen in the pictures are used on a prestigious government building facade in Utrecht, the Netherlands. A special […]