End Use: Steel racks
Project Started & Completed: September 2019 – November 2019
Total Weight: 480 tons
Scope:
• Purchasing Raw Material (with 3.1 certificate)
• Structural Steel Fabrication according to EN 1090-EXC2.
• QA/QC
• Coating (Hot-dip galvanizing)
• Transportation to Site (DDP/Netherlands)

Location: Netherlands

YENA completed a Reefer Rack Project Fabrication on a very tight schedule including manufacturing and galvanizing. Manufacturing was done in accordance with EN 1090 EXC2.

Because of the tight schedule goods were delivered by trucks directly to site for installation.
Our team ensured there were no dimensional issues during manufacturing which resulted in swift installation at client’s site.