Pipe Spools and Supports Fabrication

End Use: LNG, Petro Storage Site
Project Started & Completed: 19 September 2019 – 9 November2019

Steel Grades: AISI 304
Scope:
• Purchasing Raw Material (with 3.1 certificate)
• Fabrication and Welding of Spools
• QA/QC (100%, RX on welds, hydrostatic examination)
• Transportation to Site

YENA acquired a stainless steel (304) pipe spool job for an LNG storage site.

Our scope: material purchase, fit up, welding, and QC with 100% hydrostatic test.

Quality file was accurately prepared by YENA welding engineers.

Pipe Spools Fabrication

0 Comments

Leave a reply

© [2024] YENA Engineering | Blog

Log in with your credentials

Forgot your details?