End Use: LNG, Petro Storage Site
Project Started & Completed: 19 September 2019 – 9 November2019
Steel Grades: AISI 304
Scope:
• Purchasing Raw Material (with 3.1 certificate)
• Fabrication and Welding of Spools
• QA/QC (100%, RX on welds, hydrostatic examination)
• Transportation to Site
YENA acquired a stainless steel (304) pipe spool job for an LNG storage site.
Our scope: material purchase, fit up, welding, and QC with 100% hydrostatic test.
Quality file was accurately prepared by YENA welding engineers.