End Use: Power Plant
Project Started & Completed: 23 January 2019 – 29 April 2019
Steel Grades: S355J2GH, AISI 316L
Total Weight: 110 Tons
Scope:
• Purchasing Raw Material (with 3.1 certificate)
• Fabrication (Cutting, Welding, Surface Treatment)
• QA/QC
• Coating
• Transportation to Site
9 units of air intake filters were manufactured for a power plant in Russia. Our client was located in Germany. An inspector and a supervisor of the client was on site during the fabrication.
Sheet metal forming, cutting, welding and painting was in our scope.