Piping Materials Fabrication for the Superheater part of a Power Plant

pipe-spools-power-plant

End Use: Power Plant
Project Started & Completed: 17 February 2019 – 13 May 2019
Steel Grades: X20CrMoV12-1

Scope:

• Purchasing Raw Material (with 3.1 certificate)
• Fabrication of Piping Materials
• QA/QC
• Coating (Sandblasting and painting)
• Transportation to Site (DDP/TURKEY)

Location: Istanbul/Turkey

Purpose of parts: maintenance of the power plant.

Supply of materials was also within the YENA scope. X20CrMoV12-1 pipes were specially produced in Europe for his project.

Pipes were ordered with TUV stamp.