Stainless Steel Docking Base

Project: Stainless Steel Docking Base
Final Usage: Offshore
Time Span: 2 Months
Destination: Netherlands

Scope:

  • Purchasing Raw Material (with 3.1 certificate)
  • Fabrication (cutting, bending, drilling, welding,
    machining, surface acid pickling)
  • QA/QC
  • Transportation to Site (DDP/Netherlands)

Details of the Project

YENA Engineering has completed the Stainless Steel Docking Base project, supporting offshore operations. Over two months, we managed material sourcing, processing, and delivery, ensuring each fabrication step—cutting, bending, drilling, welding, machining, and acid pickling—was carried out precisely. The project was delivered to the Netherlands with all quality measures verified.

For your next offshore project, consider YENA Engineering for reliable delivery and meticulous craftsmanship.

© [2024] YENA Engineering | Blog

Log in with your credentials

Forgot your details?